-
Alpine Satellite Development Plan Water Quality Monitoring Report, 2010
During the winter of 1998/1999, ConocoPhillips Alaska, Inc. (CPAI) initiated construction of the Alpine Facility (CD1 and CD2) in the Colville River Delta (CRD). Alpine... -
Alpine Pipeline River Crossing 2009 Monitoring Report
The Alpine Pipeline System was originally constructed during the winter of 1998/1999. The pipeline crosses three major rivers between the Alpine Development CD1 facility and its... -
Alpine Satellite Development Plan Water Quality Monitoring Report, 2011
The Alpine Satellite Development Plan (ASDP) 2011 Water Quality Monitoring Report presents the result of the field sampling conducted in August 2011 for ConocoPhillips Alaska,... -
Alpine Pipeline River Crossing 2010 Monitoring Report
Originally constructed during the winter of 1998/1999, the Alpine Pipeline System crosses three major rivers between the Alpine Development CD1 facility and the tie-in to the... -
Fiord West 2009 Hydrologic Assessment
This report presents observations and findings of the Fiord West 2009 Hydrologic Assessment conducted by Michael Baker Jr., Inc. (Baker) at the request of ConocoPhillips Alaska... -
Greater Moose's Tooth 1 Alpine Satellite Project 2009 Spring Breakup Hydrolog...
This report presents observations and findings of the 2009 Greater Moose’s Tooth 1 (GMT1) Alpine Satellite Project Spring Breakup and Hydrologic Assessment conducted by Michael... -
Colville River Delta Lakes Recharge Monitoring and Analysis
The State of Alaska Department of Natural Resources (ADNR) Office of Habitat Management and Permitting (OHMP) oversees fish habitat permitting in the Colville River Delta. The...