FINAL_2010_Pipeline_Monitoring_09_27_10(120259-001).pdf
Datu multzoaren laburpenarena
Originally constructed during the winter of 1998/1999, the Alpine Pipeline System crosses three major rivers between the Alpine Development CD1 facility and the tie-in to the Kuparuk...
Iturria: Alpine Pipeline River Crossing 2010 Monitoring Report