FINAL_2010_Pipeline_Monitoring_09_27_10(120259-001).pdf
Úr útdrætti gagnapakka
Originally constructed during the winter of 1998/1999, the Alpine Pipeline System crosses three major rivers between the Alpine Development CD1 facility and the tie-in to the Kuparuk...
Heimild: Alpine Pipeline River Crossing 2010 Monitoring Report
Það hafa engar sýnir verið búnar til fyrir þetta tilfang.
Viðbótarupplýsingar
| Svæði | Gildi | 
|---|---|
| Data last updated | 17 desember, 2019 | 
| Metadata last updated | 17 desember, 2019 | 
| Stofnað | 17 desember, 2019 | 
| Skráasnið | application/pdf | 
| Leyfisskilmálar | Leyfi ekki tilgreint | 
| created | meira en 5 ár síðan | 
| format | |
| id | c42ff088-08ff-4946-80fe-52e53266058c | 
| last modified | meira en 5 ár síðan | 
| mimetype | application/pdf | 
| on same domain | True | 
| package id | 0afa846f-7c1d-45d2-8d0b-06678e58f4c9 | 
| revision id | 0d2a9081-3691-4173-b9e2-56f19eeea9a1 | 
| size | 4,7 MiB | 
| state | active | 
| url type | upload |