FINAL 2009 Pipeline Monitoring_09_23_09(117009-001).pdf
Úr útdrætti gagnapakka
The Alpine Pipeline System was originally constructed during the winter of 1998/1999. The pipeline crosses three major rivers between the Alpine Development CD1 facility and its tiein to...
Heimild: Alpine Pipeline River Crossing 2009 Monitoring Report
Það hafa engar sýnir verið búnar til fyrir þetta tilfang.
Viðbótarupplýsingar
| Svæði | Gildi | 
|---|---|
| Data last updated | 17 desember, 2019 | 
| Metadata last updated | 17 desember, 2019 | 
| Stofnað | 17 desember, 2019 | 
| Skráasnið | application/pdf | 
| Leyfisskilmálar | Leyfi ekki tilgreint | 
| created | meira en 5 ár síðan | 
| format | |
| id | 524167ac-32f9-401e-86f6-bb6f4cd5a4c6 | 
| last modified | meira en 5 ár síðan | 
| mimetype | application/pdf | 
| on same domain | True | 
| package id | a6b7d470-158a-4ee3-b144-85771df01356 | 
| revision id | 27981c1f-c5eb-4dbd-aaf7-b24718cb7126 | 
| size | 6,6 MiB | 
| state | active | 
| url type | upload |