FINAL 2009 Pipeline Monitoring_09_23_09(117009-001).pdf
来自数据集摘要
The Alpine Pipeline System was originally constructed during the winter of 1998/1999. The pipeline crosses three major rivers between the Alpine Development CD1 facility and its tiein to...
该资源暂时没有视图
其他信息
域 | 价值 |
---|---|
Data last updated | 十二月 17, 2019 |
Metadata last updated | 十二月 17, 2019 |
创建的 | 十二月 17, 2019 |
格式 | application/pdf |
授权 | 没有指定授权 |
created | 5年前 |
format | |
id | 524167ac-32f9-401e-86f6-bb6f4cd5a4c6 |
last modified | 5年前 |
mimetype | application/pdf |
on same domain | True |
package id | a6b7d470-158a-4ee3-b144-85771df01356 |
revision id | 27981c1f-c5eb-4dbd-aaf7-b24718cb7126 |
size | 6.6 MiB |
state | active |
url type | upload |